Logo
 
 
12/22/2024
 
 
 
 
 
By:Adam T
Dates:12/27/2005 - 1/6/2009
Album Info:Providence & Worcester local CT-1 works the area around New Haven, Connecticut. Typical assignments for this job involve working the Belle Dock Industrial Track, with the main customer being Gateway Terminal, as well as Conrail's former "Middletown Cluster," which includes the Middletown Branch, Berlin Branch, Portland Running Track, and the Valley Line. The vast majority of the traffic on the Middetown Branch is generated by the sprawling Tilcon Connecticut quarry on the Wallingford/Durham town line.
  Page Controls   View:  Pics Per Page:
In the Snow
Title:  In the Snow
Description:  The last remaining diamond on the PW system sits quietly in heavy snowfall from the first snow storm of the season.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 10:01:45 AM
Location:  Middletown, CT
Author:  Abam Twombly
Categories: 
Locomotives: 
Views:  308   Comments: 0
PW 3904
Title:  PW 3904
Description:  PW 3904 leads train CT-1 toward the Berlin Branch just after switching Murphy Road Recycling across the river in Portland.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 10:09:09 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3904(B39-8E)
Views:  360   Comments: 0
MRRX 3168
Title:  MRRX 3168
Description:  MRRX 3168 is the fiqst car on train CT-1 as the train arrives at Middletown after switching Murphy Road Recycling across the river in Portland.
Photo Date:  12/15/2007  Upload Date: 12/15/2007 9:47:18 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories:  RollingStock
Locomotives: 
Views:  111   Comments: 0
Pasping Through the Hustle and Bustle
Title:  Pasping Through the Hustle and Bustle
Description:  PW 4002 is the rear unit on#train CT-1, as the train passes through the hustle and bustle of bridge inspections. That white vehicle will proceed south as soon as CT-1 clears the site.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:27:13 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8)
Views:  328   Comments: 0
CT-1 at Murphy Road Recycling
Title:  CT-1 at Murphy Road Recycling
Description:  PW 3907 uncouples from PW 3902 and PW 4002. That unit will now pull 7 loads from Murphy Road Recycling.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:31:55 PM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8) PW 3902(B39-8E) PW 3907(B39-8E)
Views:  380   Comments: 0
PW 4002 and PW 3907
Title:  PW 4002 and PW 3907
Description:  PW 4002 looks on as PW 3907 switches Mprphy Road Recycling.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:39:38 PM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8) PW 3907(B39-8E)
Views:  312   Comments: 0
PW 4002
Title:  PW 4002
Description:  PW 4002 leads train CT-1 away from Murphy Road Recycling, just after 7 loads were picked up there.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:47:23 PM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8)
Views:  239   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 shoves 7 loads of demolition toward the Middletown yard. They will be dropped off there, and then the unit will go pull 3 empties from Primary Steel. After that, the 3 empties will be left in the yard, the 7 high-sided gondolas will be picked up (along with 4 others), and the train will go to Hartford.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:51:34 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  302   Comments: 0
Train CT-1 on the Nook Hill Briage
Title:  Train CT-1 on the Nook Hill Briage
Description:  PW 3907, the trailing unjt on train CT-1, crosses the Nook Hill Bridge. The train is on its way to interchange with CSOR in Hartford.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:55:05 PM
Location:  Cromwell, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  388   Comments: 0
PW 4002
Title:  PW 4002
Description:  PW 4002 leads train CT-1 northbound across the intersection of Pratt Street, Glastonbury Avenue, Riverview Road, and Meadow Road. The train is going to the CSOR interchange in Hartford.
Photo Date:  12/27/2007  Upload Date: 9/25/2008 5:29:32 PM
Location:  Rocky Hill, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8)
Views:  149   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 southbound past the Lyman Orchards Packing House. The train is bound for the Cedar Hill Yard.
Photo Date:  1/21/2008  Upload Date: 1/25/2008 5:48:54 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  142   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 southbound through the town of Wallingford. The train is bound for the Cedar Hill Yard in New Haven.
Photo Date:  1/21/2008  Upload Date: 1/25/2008 5:53:09 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  144   Comments: 0
PW 3907
Title:  PW 3907
Description:  CT-1 approaches East Center Street with 3907 in charge and a couple empties from Primary Steel in tow.
Photo Date:  1/21/2008  Upload Date: 1/21/2008 5:33:34 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  184   Comments: 0
PW 3905
Title:  PW 3905
Description:  PW 3905 switches Primary Steel on the Berlin Branch. TTPX 804436 is an empty that has just been pulled from the company.
Photo Date:  2/19/2008  Upload Date: 2/22/2008 3:58:34 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3905(B39-8E)
Views:  252   Comments: 0
PW 3905 and TTPX 804436
Title:  PW 3905 and TTPX 804436
Description:  PW 3905 exits the Primary Steel building with TTPX 804436 in the foreground. The flat car was just pulled from the customer.
Photo Date:  2/19/2008  Upload Date: 2/22/2008 4:03:24 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3905(B39-8E)
Views:  320   Comments: 0
PW 3905
Title:  PW 3905
Description:  PW 3905 leads train CT-1 across the Middletown diamond, just after picking up 7 high-sided gondolas in the Middletown Yard. The train is about to go across the Connecticut River to switch Murphy Road Recycling, where the high-sided gondolas will be dropped off.
Photo Date:  2/19/2008  Upload Date: 3/1/2008 10:37:42 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3905(B39-8E)
Views:  181   Comments: 1
PW 3906
Title:  PW 3906
Description:  CT-1 crosses the Middletown diamond with PW 3906 placed in the middle of the train. The crew will shove those high-sided gondolas in to the Midstate/Murphy Road Recycling facility once they're across the Connecticut River.
Photo Date:  2/19/2008  Upload Date: 3/1/2008 10:42:05 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3906(B39-8E)
Views:  213   Comments: 0
PW 4003
Title:  PW 4003
Description:  PW 4003 leads train CT-1 southbound toward the Cedar Hill Yard in New Haven. The train is approaching Dibbles Edge Road.
Photo Date:  4/10/2008  Upload Date: 4/16/2008 4:28:32 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4003(B40-8)
Views:  283   Comments: 1
PW 3901
Title:  PW 3901
Description:  Train CT-1 switches the Tilcon quarry. Once finished, the train will go to Middletown and Portland.
Photo Date:  4/16/2008  Upload Date: 4/17/2008 10:12:41 AM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E)
Views:  254   Comments: 0
PW 3901
Title:  PW 3901
Description:  Train CT-1 crosses the Connecticut River after switching Smurfit-Stone Container and Murphy Road Recycling in Portland.
Photo Date:  4/16/2008  Upload Date: 4/17/2008 10:15:27 AM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E)
Views:  313   Comments: 0
PW 2216
Title:  PW 2216
Description:  PW 2216 leads train CT-1 over the Coginchaug River in the Rockfall section of Middlefield. June 24, 2008 (the day before this photo was taken) marked the first day in almost 8 years since this locomotive was assigned to a train out of New Haven.
Photo Date:  6/25/2008  Upload Date: 6/25/2008 9:48:36 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 2216(B23-7R)
Views:  272   Comments: 0
PW 2216
Title:  PW 2216
Description:  PW 2216 is the trailing unit on train CT-1, as the train passes an old cement plant in Cromwell. The train is bound for the Connecticut Southern interchange in Hartford. June 24, 2008 (the day before this photo was taken) marked the first day in almost 8 years since this locomotive was last assigned to a train out of New Haven. June 25, 2008 (the day this photo was taken) marked the first time PW 2216 ever went to Hartford.
Photo Date:  6/25/2008  Upload Date: 6/25/2008 9:58:05 PM
Location:  Cromwell, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 2216(B23-7R)
Views:  311   Comments: 2
PW 2216
Title:  PW 2216
Description:  PW 2216, the trailing unit on train CT-1, passes the Narcissus Chocolate Cafe, just after crossing Church Street in Wethersfield. The train is bound for the Connecticut Southern interchange in Hartford. June 24, 2008 (the day before this photo was taken) marked the first day in almost 8 years that this locomotive was assigned to a train out of New Haven. June 25, 2008 (the day this photo was taken) was the first day this locomotive ever made the trip to Hartford.
Photo Date:  6/25/2008  Upload Date: 6/25/2008 10:06:50 PM
Location:  Wethersfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 2216(B23-7R)
Views:  333   Comments: 1
PW 2216
Title:  PW 2216
Description:  PW 2216 leads train CT-1 southbound toward Main Street in Wethersfield. The train has just picked up those 2 box cars and 14 high-sided gondolas from the Connecticut Southern interchange in Hartford. The train will now go to Middletown, the Portland to switch Murphy Road Recycling, and then back to the Cedar Hill Yard in New Haven. June 24, 2008 (the day before this photo was taken) marked the first day in almost 8 years this locomotive was assigned to a train out of New Haven. June 25, 2008 (the day this photo was taken) was the first time this locomotive ever made the trip to Hartford.
Photo Date:  6/25/2008  Upload Date: 6/25/2008 10:23:38 PM
Location:  Wethersfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 2216(B23-7R)
Views:  336   Comments: 1
PW 3901
Title:  PW 3901
Description:  PW 3901 leads train CT-1 southbound across Aston Lane.
Photo Date:  8/6/2008  Upload Date: 8/15/2008 5:56:38 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E)
Views:  196   Comments: 0
PW 3901
Title:  PW 3901
Description:  PW 3901 leads train CT-1 southbound toward Main Street in the Rockfall section of Middlefield.
Photo Date:  8/6/2008  Upload Date: 8/15/2008 6:10:31 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E)
Views:  206   Comments: 0
PW 3905 and TLTX 7355
Title:  PW 3905 and TLTX 7355
Description:  PW 3905, on train CT-1, passes TLTX 7355 while switching the Tilcon quarry.
Photo Date:  8/18/2008  Upload Date: 8/28/2008 11:31:40 AM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3905(B39-8E) TLTX 7355(44Tonner)
Views:  489   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  PW 3909 leads train CT-1 southbound through rural Middlefield with a few cars of construction debris in tow. Route 157 is out of the photo behind those trees on the right.
Photo Date:  12/26/2008  Upload Date: 12/28/2008 7:32:49 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3909(B39-8E)
Views:  319   Comments: 2
Train CT-1
Title:  Train CT-1
Description:  PW train CT-1 heads nortk towards Middletown on the old Airline. In the consist is KWUX 18, a flat car that will be used to shuttle high and wide loads between Cromwell and Middletown for the under-construction Kleen Energy power plant.
Photo Date:  1/6/2009  Upload Date: 1/7/2009 2:20:47 PM
Location:  Middlefield, CT
Author:  Ken Twombly
Categories: 
Locomotives:  PW 3909(B39-8E) PW 3903(B39-8E)
Views:  359   Comments: 1
PW 3908
Title:  PW 3908
Description:  PW 3908 leads train CT-1 into Middletown on a snowy winter morning.
Photo Date:  1/19/2009  Upload Date: 12/24/2010 1:22:15 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories:  Winter
Locomotives:  PW 3908(B39-8E)
Views:  173   Comments: 0
PW 3908
Title:  PW 3908
Description:  PW 3908 crosses the diamond in Middletown on a snowy winter morning.
Photo Date:  1/19/2009  Upload Date: 12/24/2010 1:23:37 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories:  Winter
Locomotives:  PW 3908(B39-8E)
Views:  179   Comments: 0
PW 3908
Title:  PW 3908
Description:  PW 3908 gets refueled in Middletown on a snowy winter morning.
Photo Date:  1/19/2009  Upload Date: 11/22/2007 12:00:32 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories:  RollingStock,Winter
Locomotives:  PW 3908(B39-8E)
Views:  229   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  With stone season starting up, Providence & Worcesters rare B-units have made a return to Cedar Hill and train CT-1. In this view, a light engine CT-1 is seen passing through CSXs Cedar Hill Yard with PW 3901, PW 3007, and PW 3907 for power.
Photo Date:  4/17/2009  Upload Date: 4/21/2009 8:55:03 AM
Location:  North Haven, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E) PW 3007(B30-7AB) PW 3907(B39-8E)
Views:  391   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  The lead units on train CT-1 are uncoupled from the rest of the train as the crew prepares to pick up loads of stone at the Tilcon Quarry on miserable April afternoon.
Photo Date:  4/21/2009  Upload Date: 7/22/2011 1:17:31 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E) PW 3007(B30-7AB)
Views:  252   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  Train CT-1 arrives at the Tilcon quarry with PW 3901 and PW 3007 in the lead. The train will pick up 20 loads of stone before proceeding to the Cedar Hill Yard in New Haven.
Photo Date:  4/21/2009  Upload Date: 9/19/2009 4:37:12 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3901(B39-8E)
Views:  226   Comments: 1
PW 3907 and TLTX 7355
Title:  PW 3907 and TLTX 7355
Description:  Train CT-1, with PW 3907 backs into the Tilcon quarry with TLTX 7355 looking on.
Photo Date:  4/21/2009  Upload Date: 9/19/2009 4:40:07 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) TLTX 7355(44Tonner)
Views:  284   Comments: 1
Train CT-1 in the Fog
Title:  Train CT-1 in the Fog
Description:  In the fog and drizzle, PW 3907 passes TLTX 7355 as it leads 20 loads of stone out of the Tilcon quarry on train CT-1.
Photo Date:  4/21/2009  Upload Date: 9/19/2009 4:46:02 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) TLTX 7355(44Tonner)
Views:  283   Comments: 1
PW 3907
Title:  PW 3907
Description:  PW 3907 is the trailing unit on train CT-1 as the train disappears into the fog after picking up 20 loads of stone from the Tilcon quarry.
Photo Date:  4/21/2009  Upload Date: 9/19/2009 4:50:57 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  160   Comments: 1
Train CT-1
Title:  Train CT-1
Description:  PW 4003 prepares to lead train CT-1 across the Connecticut River Swing Bridge, headed for Midstate/Murphy Road Recycling.
Photo Date:  7/13/2009  Upload Date: 7/13/2009 12:00:00 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4003(B40-8)
Views:  295   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  After switching Midstate/Murphy Road Recycling, train CT-1 prepares to cross the Connecticut River swing bridge once again with PW 4003 now as the trailing unit.
Photo Date:  7/13/2009  Upload Date: 7/13/2009 3:21:02 PM
Location:  Portland, CT
Author:  Afam Twombly
Categories: 
Locomotives:  PW 4003(B40-8)
Views:  321   Comments: 0
Over the River and Through&the Woods
Title:  Over the River and Through&the Woods
Description:  PW 4003 is the trailing unit as train CT-1 begins to cross the Connecticut River swing bridge.
Photo Date:  7/13/2009  Upload Date: 7/13/2009 3:24:13 PM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4003(B40-8)
Views:  875   Comments: 5
Train CT-1
Title:  Train CT-1
Description:  PW 3906 leads train CT-1 northbound past one of Wallinfford's many farms as the train approaches East Center Street.
Photo Date:  8/25/2009  Upload Date: 12/29/2007 2:35:47 PM
Location:  Twin Lakes, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3906(B39-8E)
Views:  278   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  PW 3906 leads train CT-1 towards the Tilcon quarry crossing on the Wallingford/Durham town line. After shoving 20 empty hoppers into the quarry, the train will proceed to Middletown.
Photo Date:  8/25/2009  Upload Date: 8/25/2009 3:55:03 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3906(B39-8E)
Views:  261   Comments: 1
Train CT-1
Title:  Train CT-1
Description:  PW 4002 looks on as PW 3906 pulls an empty coil car from the Primary Steel siding at the end of the Berlin Running Track.
Photo Date:  8/25/2009  Upload Date: 8/25/2009 4:10:01 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3906(B39-8E) PW 4002(B40-8)
Views:  340   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  PW 3904 leads CT-1 southbound past the Lyman Orchards Packing House after picking up an empty coil car from Primary Steel in Middletown.
Photo Date:  8/25/2009  Upload Date: 8/25/2009 4:13:51 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3904(B39-8E)
Views:  301   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  PW 3904 leads train CT-1 towards Williams Road after picking up 20 loads of stone from the Tilcon quarry.
Photo Date:  8/25/2009  Upload Date: 8/25/2009 4:21:52 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3904(B39-8E)
Views:  308   Comments: 1
Train CT-1
Title:  Train CT-1
Description:  Train CT-1 switches Midstate/Murphy Road Recycling, the only customer left on the Portland side of the Connecticut River.
Photo Date:  6/18/2010  Upload Date: 7/7/2010 10:40:02 AM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3903(B39-8E) PW 3905(B39-8E)
Views:  378   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  After switching Midstate/Murphy Road Recycling, train CT-1 prepares to cross the Connecticut River once again and return to Middletown.
Photo Date:  6/18/2010  Upload Date: 7/7/2010 10:57:36 AM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3903(B39-8E)
Views:  379   Comments: 1
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 southbound through the Rockfall section of Middlefield. The train is about to cross Cherry Hill Road.
Photo Date:  6/29/2010  Upload Date: 7/7/2010 12:54:18 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  134   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  PW 3907 leads train CT-1 southbound with three loads from Midstate/Murphy Road Recycling in Portland. The train is about to pass the Lyman Orchards Packing House.
Photo Date:  6/29/2010  Upload Date: 7/7/2010 12:49:35 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  154   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net