Track Broom at Work         
The new 2nd track is getting a few final touches. Apparently 'new temporary' Tanglewood signal for the new track using an old B&O signal is in place awaiting activation. The new Tanglewood signals are across the bridge along with a set of cross overs. /DL
Date: 10/24/2014 Location: Bladensburg, MD   Map Show Bladensburg on a rail map Views: 78 Collection Of:   David Larrabee
Author:  David Larrabee
Track Broom at Work
Picture Categories: Signal,Track This picture is part of album:  Double Track on the Alexandria Extension
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4016112