CP caboose on MNS Sub.         
CP plans to work on the MNS Sub. tracks through Bloomington and Edina allowing 20 mile per hour speeds over the current 10 mile per hour speed.
Date: 10/14/2015 Location: Bloomington, MN   Map Show Bloomington on a rail map Views: 96 Collection Of:   Eric Ecklund
Author:  Eric Ecklund
CP caboose on MNS Sub.
Picture Categories: This picture is part of album:  Dan Patch Corridor
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4351382