3rd Rail Project         
Barricade set up on the Providence and Worcester track by Boston Switch tower. Temporary switch giving the Providence and Worcester access to the Amtrak Northeast Corridor was here, while this track was lowered thru Pawtucket Depot. Switch was removed with this last phase, and the grade lowered approximately 2 feet for auto rack clearance under the Sacred Heart Avenue bridge
Date: 8/5/2006 Location: Central Falls, RI   Map Show Central Falls on a rail map Views: 270 Collection Of:   Ron Chouinard
Author:  Ron Chouinard
3rd Rail Project
Picture Categories: This picture is part of album:  Amtrak and the Northeast Corridor
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=460267